Plumbing Permits and Inspections

Plumbing permits, applications for permits, and permit questions are
addressed during office hours Monday through Friday, 8:00 a.m. to 4:00
p.m. The permit application process takes about 30 minutes.
Plan to arrive at our office by 3:00 p.m. to begin a new application.
|
What you will need:
 | An isometric drawing of the planned plumbing project |
 | Owner's complete name and phone number |
 | Service address |
 | Plumbers name and phone number |
 | Payment: Cash or check; the cost varies by type of permit, service location, and water meter size. You may call ahead for a
cost quote. |
|
Plumbing Inspection
|
| Inspections are required to verify plumbing is in
compliance with all applicable New York State and local building codes. Do
not cover, bury or otherwise hide any plumbing prior to having it properly
inspected and approved by Bolton Point staff. At the time the
plumbing permit is issued, the number of inspections included in the permit are
explained. Additional inspection trips can be provided at additional cost.
|
|
|
|
Includes typical water service
information including inspection checklists, and diagrams for both municipal
water, and sewer services.
-
"This information is intended to assist
contractors and property owners in meeting state and local codes. This
summary is not all-inclusive nor does it replace existing codes. This
summary addresses areas where deficiencies are frequently noted or about
which questions are frequently asked. It is recommended that you
contact our office with any proposed changes or questions that you have.
This document does not necessarily reflect recent changes in these codes.
The owner of a property is the permit holder and is responsible for meeting
the minimum requirements of all applicable codes and regulations."
|
|
|
Click
to enlarge |
|